Trace: Project Index

Project Index

Back  
 Next

This is an old revision of the document!


 

I have published these notes on my public wiki website https://wiki.kptree.net/, for my own access and also and possible benefit to others. I am not interested in advertising on this site. As these are my personal notes, provided without cost, I assume no obligations in anyway should anyone in anyway use them in full or part. YOU USE THESE NOTES AT YOUR OWN RISK!

PageDateTags
Project Index2021-12-29 Wed wk52 11:39, , , , , ,
Python Programming Notes2025-02-22 Sat wk08 10:52, ,
Oscilloscope2023-12-26 Tue wk52 11:48
Electronics Info/Data2023-09-16 Sat wk37 08:52,
Sprinkler Solenoid 24VAC Woes2024-03-13 Wed wk11 21:25, , , , ,
Ethernet Twisted Pair Cables2024-08-24 Sat wk34 12:22, , ,

Grid Power

It's not what you think... it's worse. Sky high power prices are by design. Topher Project Ep 194

Bid Stack Electric Power System

Description Type Response Inertia Capital Cost Power marginal cost Power Stability
Nuclear (++++) base +++ Slow - High ++ High - - - - - Low + High +++
Coal (+++++) base +++ Slow - High ++ High - - - Low + High +++
Gas (++++++++) Base/Flex ++++ Fast +++ High ++ High - - High - High +++
Wind (- - - - - - - - - - - - - - -) Intermittent - - - - - NIL - - - - - NIL - - - High1) - - - Low +++++ Low - - -
Solar (- - - - - - - - - - - - - - -) Intermittent - - - - - NIL - - - - - NIL - - - High1) - - - Low +++++ Low - - -
Hydro (+++++++++++++++) Flex ++++ FAST ++ HIGH +++ High - - - - Low +++++ High +++
Pumped Hydro (+++) Flex Storage ++++ FAST + NA High - - - - High - - - High +++
Battery Storage Grid Following (++) Flex Storage ++++ FASTEST ++++ LOW - High - - - High - - - High +++
Battery Storage Grid Forming (++++++) Flex Storage ++++ FASTEST ++++ HIGH ++ High - - - High - - - High +++

Home Solar / BESS

First Solar System

I had installed upon my house circa 2013 5kW of solar panels (20 x 250W peak capacity solar panels with 10 micro inverters each with 2 x 250W rated inputs). I replaced this system with new solar cells and string inverter in April 2025.

Comments on system performance and why I replaced; tl;dr;

New Solar System with BESS

I replaced the solar panels with a 6.6kW panel / 5kW sting inverted in April 2025. In August 2025 I had install a 5kW/10kWhr battery system.

1)
Grid scale remote location power distribution
/app/www/public/data/attic/project/index.1762052179.txt.gz · Last modified: 2025-11-02 Sun wk44 10:56
CC Attribution-Share Alike 4.0 International Except where otherwise noted, content on this wiki is licensed under the following license: CC Attribution-Share Alike 4.0 International